
Pacific Palisades is part of the City of Los Angeles, so LADBS issues the building and grading permits and the Department of City Planning holds zoning and entitlements. From a surveyor's side, three things set the Palisades apart from the rest of the city. Most Palisades properties lie within the City's Hillside Area, and that changes two measurements. Building height is measured point by point, as the difference between each point on the roof and the topography surveyed around the building, rather than from the single lowest ground point within five feet of the building envelope that applies on a flat lot. And floor area on a hillside lot is set from a slope analysis, so the topographic survey has to support one. More lots than almost anywhere else in the city sit on a bluff or canyon edge that has to be surveyed. And across the burn area the property corner monuments are frequently gone, so the boundary has to be re-established before anything else can be measured against it.
We work the Palisades for property owners rebuilding, and for the architects, civil engineers and contractors carrying those projects through plan check. Every survey is performed under a licensed California land surveyor, PLS 8099, and prepared to the content LADBS and City Planning reviewers expect.
Lot width, lot depth, where the footprint sits and how tall the house may be all come back to the boundary and the grade, which is why the boundary and topographic surveys come first on a Palisades rebuild and everything else is drawn on top of them. Drawing the pre-fire and proposed footprints is the architect's work; ours is the base they are drawn on.
We have collected UAV aerial imagery and survey data over portions of Pacific Palisades. On cleared adjacent lots this is where aerial work earns its keep, because bare-earth topography across several parcels in one flight beats ground survey economics badly. Coverage is not comprehensive and we will not assume your lot is included. Send us the address and we will confirm what we already hold before scoping the survey. Airspace is verified per parcel before any flight.
One caveat we would rather state than have you discover: the Palisades ground surface has moved. Ash, sheet erosion, hydroseed and interim grading changed it, and the storm seasons since the fire reworked slopes. We date-stamp every flight and say on the deliverable what the surface represents.
Beyond rebuild work, we support a wide range of Palisades residential and commercial survey needs.
Palisades lots often involve steep grades, view restrictions, and complex site conditions. We work with hillside lots regularly and deliver surveys designed for hillside ordinance compliance and grading feasibility.
Our field-to-finish automation workflow accelerates map production, and UAV coverage in parts of the area can further shorten turnaround. Rebuild teams need speed without sacrificing accuracy, and that is what we deliver.
Sergei Builoff, California PLS 8099, personally oversees every survey. No outsourcing and no project management layer between you and the responsible surveyor.
Based in Calabasas and incorporated in California in 2006. Familiar with LA permitting, County recording, hillside ordinance, and the specific parcel conditions common in Palisades neighborhoods.
Full survey and mapping service range available for Palisades projects. Click any service for full details.
Almost always, yes, and the reason is physical. Debris removal across the burn area took out improvements, fences, walls and in many cases the property corner monuments with them. The city's grading code allows the Department to require plans prepared by a licensed surveyor when the property location and its limits are not clear, which after clearance is the normal condition rather than the exception. A boundary survey re-establishes the lines from record research and whatever monuments survived, and the monuments found, referenced or set are documented in a Corner Record filed with the LA County Surveyor.
Point by point, because most of the Palisades sits in the City's Hillside Area. On a hillside lot the height limit applies at every point of the building: each point on the roof is measured vertically to the ground directly below it, on the lower of the natural or finished grade, and no point may exceed the limit. There is no single reference elevation. So the work starts with a topographic survey of the ground around and under the building, we shoot the roof at several points along the ridge or parapet and the eaves, and the certification is a table: for each roof point, the ground elevation beneath it, the roof elevation, and the height between the two. Where the project is also held to an overall height, the same survey supplies the lowest ground point near the walls. The code says plainly that retaining walls cannot be used to raise the grade, so fill never buys height. Outside the Hillside Area the City uses the method most people know: the single lowest ground point within five feet of the exterior walls is the reference, and height runs from that point to the highest point of the roof, structure or parapet. Either way, the LADBS bulletin on height says the measurement should come from a topographic map signed by a licensed civil engineer or land surveyor, not from a building section, and a survey of the four corners cannot support it.
When a project involves significant grading, the city requires an as-graded plan at completion showing the pads, slopes, structures, original contours and finished elevations as they were actually built, so the Department can compare the finished ground to the approved grading plan. The Los Angeles grading code names the land surveyor directly as one of the two professionals who may prepare and sign it, alongside the design civil engineer, and that signature certifies that the signer inspected the site and that the work in their area of responsibility was done per the approved plan. The soils and geology closeout reports then reference that dated as-graded plan. On a rebuild with no grading none of this is engaged; the moment the project changes grade, it is.
More than before, not less. Under the city's self-certification program a licensed architect or civil engineer can take an eligible like-for-like rebuild through without a plan check, and in exchange they personally certify that the zoning requirements are met. Land surveyors are not a self-certifying discipline. So the setback, grade and height figures behind that certification still have to come from a survey, and the professional signing is personally responsible for them. In practice self-certification moves the survey earlier, not later.
Faster than most jurisdictions, because the inspection clock on rebuild projects is short, a matter of days from request to inspection. That means construction staking and the foundation forms check have to be ready to that clock rather than to a week's notice, so the survey schedule needs to be set when the permit is in sight, not when the forms are up. We set offset stakes referencing the building corners or the controlling property line, with at least one elevation hub on a known datum, and deliver a one-page staking exhibit the contractor hands to the inspector at the foundation inspection.
It needs one distinction. The language many owners have seen, that most rebuilds will require a corner record survey and that it is the owner's responsibility to hire a private surveyor, comes from LA County Public Works and is written for unincorporated LA County. Pacific Palisades is in the City of Los Angeles, where the requirement is worded differently: the Department may require survey-prepared plans where the property limits are not clear, and the city's Palisades grading bulletin states that a grading pre-inspection waiver does not waive the requirement for a property line survey. Commonly required is the accurate description for a City parcel. Either way, the survey is the same: a boundary survey, with a Corner Record filed for the monuments it finds or sets.
Yes, because the like-for-like rules are applied to the lot. A like-for-like rebuild compares the new house with the one that burned: its size, its height, and how far the footprint may shift, and that shift is measured as a share of lot width and lot depth. Lot width, lot depth and the position of the footprint only mean something measured from the real property lines. This is where rebuilds go wrong. The parcel lines on a county or city GIS map are not property lines, and neither are lines plotted from the deed alone. Both can sit several feet off the true boundary. A boundary survey establishes the actual lines from record research and the monuments found or set, and the topographic survey puts the grade on the same base. Drawing the pre-fire and proposed footprints is the architect's work; ours is the base they are drawn on. If the architect draws on anything else, the comparison is wrong before it starts.
Not the surveyor, and that surprises people. Whether a bluff exists, and where its edge is, is a determination made by a California-licensed engineer or geologist. What the surveyor supplies is the surface that determination is made on: we shoot the top of bluff, the slope geometry, and the top and toe of the slope, and provide the spot elevations the engineer or geologist needs. Once the edge is determined we locate it, survey it, and carry the required setback offset from it as a control line on the site plan and in the field at staking.
No. The city's fee suspension applies to LADBS fees for qualifying owners rebuilding after the fires. Separately, in unincorporated LA County the Board of Supervisors waived a list of county fees, including corner record survey fees, for qualifying owners. Both are government fees. A private surveyor's own fee is not a government fee and no waiver covers it. We mention this because the two get conflated constantly, and an owner who budgets on the assumption that the survey is covered gets an unpleasant surprise.
The property address or APN, and what you are planning. For a rebuild, any old survey or plot plan you still have helps us; permits, Certificates of Occupancy and old plans help your architect reconstruct the pre-fire house. We pull the boundary records from the county and the city. A current preliminary title report is worth having early, because easements and any recorded offers to dedicate need to be plotted rather than discovered at plan check. We will confirm the right scope and respond with an estimate, usually within 24 hours, and we will tell you if we already hold aerial coverage over your lot.
We work throughout Pacific Palisades, including Huntington Palisades, the Alphabet Streets, North Village, the Commercial Village and Palisades Village, the Riviera, Rustic Canyon and the Will Rogers area, Potrero Canyon, Temescal Canyon, Via Bluffs, El Medio Bluffs and Las Casas, Castellammare and Paseo Miramar, Upper and Lower Marquez, the Palisades Highlands, Sunset Mesa, Tahitian Terrace, Palisades Bowl and Malibu Village.
In the Palisades Highlands, recorded maps draw lines that limit where a house may be placed on certain lots. Those lines are plotted from the recorded map onto the boundary survey and located on the ground, not scaled from a screen.
The departments and records sources behind Palisades survey work:
Just outside the Palisades, we also serve Malibu, Santa Monica, Topanga and the wider City of Los Angeles.
4.8
★★★★★
★★★★★
Very good surveying company, ordered property line survey from them, very responsive staff, great price good turn around time
Rustam Kereibaev
★★★★★
Very professioanl and responsive company, they did survey for my ADU project in a very short time and for a great price. Definitly recommend
Alex Kimm
★★★★★
Juan surveyed our family property, which was built in the 1920s and involved navigating some difficult terrain. We had a great experience working with him. He was super friendly, helpful, professional, and hardworking from start to finish. He took his time surveying the property, was very thorough and detail-oriented, and was always happy to answer my questions and explain what he was doing along the way. You could tell he genuinely cared about doing a good job and making sure everything was done correctly. I would definitely recommend Juan and Builoff Surveying and Mapping to anyone looking for a surveyor.
Jessica Daly
★★★★★
I recommend this company to anyone who is looking to get boundary and topographic survey for properties affected by palisades fire. They gave me very good price and were very helpful and professional
Muslima Tasbolat
Pacific Palisades
Builoff Surveying & Mapping, Inc.
4004 Schuylkill Dr
Calabasas, CA 91302
By appointment only
(323) 240-2303Monday to Friday, 9:00 am to 5:00 pm
Serving Los Angeles and Ventura counties
Sergei Builoff, MSc, PLS 8099
The requirements above were compiled from publicly available city and county sources and reviewed on the date shown below. They are general information, not a professional opinion, and they change. Confirm anything you intend to rely on with the administering department before acting on it.